Government group
AED 15B assets
- Framework
- IFRS, ISA
- Role
- Engagement In-Charge
AED 60M+ misstatements identified
External auditor, ACCA. I trace financial-reporting issues to the process and control weaknesses behind them, and write conclusions that hold up in review.
Open to senior roles
Fastest way to reach me
External audit, Intern to Engagement In-Charge
Concurrent IFRS and ISA engagements, 7 industries
Material misstatements found in one AED 15B group
Associates supervised and reviewed per engagement
One engagement from practice and two Canadian-framework simulations. Filled blue tags mark real work; outlined tags mark fictional practice cases.
As Engagement In-Charge, I traced property and construction balances back to the documents behind them.
From untransferred CWIP to outdated fair values, property accounting gaps affected asset reporting.
Traced balances to contracts, completion certificates and valuations across several subsidiaries in parallel.
Issues behind AED 60M+ in material misstatements, which the client corrected, and a recommendation for SAP-based project tracking that the client is considering.
Balances in scope
Traced to
Outcome
A fictional Ontario-based component manufacturer, NorthStar Precision faced potential discrepancies between recorded sales, shipping documentation, customer acceptance and product returns.
Overall materiality: 3% of revenue, CAD 2,460,000. Performance materiality: 65%, CAD 1,599,000. The dashed line marks performance materiality; each finding is compared with it on its own, not added up.
Proposed under ASPE 3031, not a completed correction.
| Account | Dr | Cr |
|---|---|---|
| Revenue | 420,000 | |
| Trade receivables | 420,000 |
| Account | Dr | Cr |
|---|---|---|
| Revenue | 1,184,700 | |
| Trade receivables | 1,184,700 | |
| Inventory | 560,000 | |
| Inventory write-down | 170,000 | |
| Cost of sales | 730,000 |
In the simulation, management rejected some proposed adjustments, so nothing here is described as corrected.
A fictional Ontario authority where engineering finished projects and Finance never heard about it, so depreciation never started.
About 46% of the balance was flagged. Classification, expense and depreciation are separate measures, not one loss.
| Closing CWIP balance | 48,000,000 | |
| Useful life | ÷ | 35 years |
| Annual depreciation | = | 1,371,429 |
| Days in use to March 31 (from Oct 1, 2026) | × | 182 / 365 |
| Not recorded | = | 683,836 |
Four years at Grant Thornton UAE, running my own engagements from Associate 1 as client size and scope grew.
Engagement In-Charge from Associate 1, with client size and scope growing at each level.
AED 15B assets
AED 60M+ misstatements identified
AED 1.5B assets
Transition balances reconciled
Several subsidiaries
Group statements in five months
Group components
Supported a prior-period restatement
The problems audit teams spend the most time on, the skills behind them, and where each standard has been applied.
Cut-off, shipping terms and bill-and-hold, tested to the documents.
Commissioning evidence checked against what Finance still shows as in progress.
Premiums, claims, reserves and receivables, reconciled to actuarial reports.
Selling prices and returns tested for lower of cost and NRV.
Clear request lists and parallel work across three to four subsidiaries.
Workpaper review, technical memos and management letters.
| Standard | Grant Thornton | NorthStar | Grand River |
|---|---|---|---|
| ISA | – | – | |
| IFRS 15 | – | – | |
| IAS 16 | – | – | |
| IFRS 17 | – | – | |
| CAS | – | ||
| ASPE 3400, 3031, 1591 | – | – | |
| PSAS 3150 | – | – |
Open to Senior External Audit, Senior Assurance and Financial Reporting roles across Toronto and the GTA.
NorthStar Precision Manufacturing and Grand River Infrastructure Agency are fictional entities built as independent learning projects in CAS, ASPE and PSAS; their figures are not client results and their recommendations were not implemented. Grant Thornton figures reflect actual engagements, with clients withheld. © 2026 Aditi Sharma.